New Deck Installation.
- 1. Determine finish floor elevation.
- 2. Determine brick or paver thickness being use in project.
- 3. Build your substructure with 16 inch on center floor joist. For you rim joist see item #10 and determine how you will construct your border.
- 4. It is recommended that deck construction be in compliance with state and local codes.
- 5. Screw down the Silca Grate™ recommend that you stagger the Silca Grate joints. (i.e. start with full Silca Grate™ then on next joist start with a half Silca Grate™) Six (6) screws per Silca Grate™.
- 6. Install Geotextile blanket (ONLY if you are going to use Polymeric sand between the joints of your bricks or pavers).
- 7 To finish you may wrap/cover with aluminum or vinyl.